
Manufacturing OEE & Downtime Dashboard
OEE the textbook way — availability × performance × quality — per shift, per machine, per line, with the downtime Pareto beside it so the meeting starts with th
What is inside
OEE the textbook way — availability × performance × quality — per shift, per machine, per line, with the downtime Pareto beside it so the meeting starts with the biggest loss. MTBF and MTTR from the downtime log, units lost from the ideal rate.
Production managers, CI engineers and plant leads in small and mid-size factories.
Power BI Desktop (free). Open the PBIP project, point the queries at your data source, refresh. The measures and pages are ready.
Yes — BLIK, Przelewy24, any card, Apple Pay, Google Pay and PayPal. Prices in PLN, EUR, USD or GBP; the currency switch is at the top.
Tick “I’m purchasing as a business” at checkout and enter your NIP / VAT ID. The invoice arrives with the download e-mail.
14-day refund, no questions. One e-mail to [email protected].